Factory & QC
Factory & quality control
What we can show, in numbers. If a figure is not confirmed by the factory, it is not on this page.
- engine codes mapped
- 13
- published sets
- 32
- GCC markets
- 7
- size grades per code
- 4
Quality control, step by step
Every batch is measured, not inspected by eye. The five checks below are the ones that actually cause field failures in Gulf conditions, and they appear in the same order in the report that ships with the goods.
- 01
Raw material certificate and hardness check on the casting lot.
- 02
Machining: bore, ring height and side clearance measured on 100% of the first article and 5% of the run.
- 03
Surface treatment thickness checked by eddy current on chrome, and by micro-hardness on nitrided rings.
- 04
Gap and tension verified at 50°C ambient — the temperature at which these engines actually run in the Gulf.
- 05
Final dimensional report filed per batch and sent with the shipment.
How an order runs
- 1
You send the engine code and the size grades you need.
- 2
We confirm the drawing, the MOQ and the FOB price within one working day.
- 3
Sample set ships first when the code is new to us; production starts after your sign-off.
- 4
Documents (inspection report, material certificate, packing list) travel with the goods.
What we do not claim
We are not an OE supplier, and we do not label our sets as genuine parts. Our rings are aftermarket replacements built to the OE drawing, and we say so on the packing list.
Compliant with SASO requirements (Supplier Declaration of Conformity)
Our rings enter Saudi Arabia under a Supplier Declaration of Conformity registered in SABER. The declaration is issued by the importer of record — a Saudi legal entity — on the basis of our test reports and material certificates.
Compliance